i have bought multiple packages from those guys... delivered (with tracking) in usually 7-10 business days, BUT they can expedite it if you need (i.e. 5 days) for extra cost (like 45 postage vs 25)...
however - this time of year there will be all sorts of disclaimers saying that times cannot be guaranteed due to the Christmas period!!!
Thanks for the help TB, will hve the engine ready mid next week, so hopefully get it back before the xmas holidays, but i highly doubt it -_-"
Just read through this whole thread, it's good knowledge for myself. I'm looking to do a B20 setup in the next week or so and I just wanted to know if I went by this list should I be ok? Is there anything else I would need besides an ECU and GB?
B20B8 block
VTEC water pump
B18C timing belt
B20B head gasket
ARP head studs
ARP rod bolts
oil line and fittings
head work (dowels/plug/surface)
piston relief work
PCV system (fittings/hoses/can)
Coolant hoses
VRS gasket kit
but you also need to check things like the condition of the driveshafts, i usually get them reconditioned at the same time if the boots are starting to crack...
but you also need to check things like the condition of the driveshafts, i usually get them reconditioned at the same time if the boots are starting to crack...
also check the engine mounts...
Yeh gonna get the drive shafts reconditioned and probs run hasport mounts.
Just read through this whole thread, it's good knowledge for myself. I'm looking to do a B20 setup in the next week or so and I just wanted to know if I went by this list should I be ok? Is there anything else I would need besides an ECU and GB?
B20B8 block
VTEC water pump
B18C timing belt
B20B head gasket
ARP head studs
ARP rod bolts
oil line and fittings
head work (dowels/plug/surface)
piston relief work
PCV system (fittings/hoses/can)
Coolant hoses
VRS gasket kit
Bookmarks