Just a short update.
Engine and box are back together now.
a little tight there i think.
Test fitting, see how much space i have..
Dummy position. and it still needs to move up 150mm up more.
I have lots of rooms to move the engine back and forward, the not side ways.
I have to create a notch on the left chassis frame to accommodate the gearbox.
The gearbox are bigger than what i expected to be.
I'm trying to keep all the suspension geometry as is and not too much mucking around with it.
but i think i might have to fabricate a new rear left trailing arm / swing arm. as it might faults the lower of the box.
from Frame to Frame i could clear all the auxiliary belts and shifter linkage system on the box.
and once it clears 150mm, the lower point of the engine is roughly the same as the lower point of the floor of the car.
Cross finger...We see how we go today, and how much i can work on it. I should have an mock up mount in and getting a rough fix position where i want to be.






We see how we go today, and how much i can work on it. I should have an mock up mount in and getting a rough fix position where i want to be.
Reply With Quote
Bookmarks