For the ASR kit -
EK4 and EM1's require the mounting holes to be drilled out. This is to allow the bolts to grip firmly and properly to the reinforcement behind.
I believe you CAN leave it , but it made strip the thread of the bolts as you tighten the bolts through it.
For the BEAKS kit , you need to drill an extra hole thru the bottom of the subrame for the lower bolt to go thru. (below the 2 mouning holes either side)I believe this is the case for all EK's.
Anyway a BEAKS or ASR kit + ITR or CTR swaybar is a good combo
no drilling on ek and em1 required..
u cant exactly drill the holes for the EK as from memeory the ek aSR block lower bolt is threaded
ok just to clear up for me cause i'm a bit slow, so if i have ek4 endlinks i can use those to put a ek9 sway no probs? is this the same for the brackets that hold it on the subframe?
if you get a complete ek9 sway bar with the "D" shape mounting brackets that's all you need. Cause ek9 and ek4 end links are the same. You only need to use your ek4 endlinks if you can only get a ITR sway bar.
Of course you'll need the ASR brace to mount either.
Bookmarks